What does a mill certificate actually prove?

A mill certificate, or mill test report (MTR), is the bar producer's record of one melt or lot. It says nothing about other lots of the same grade, or about what happened to the bar after it left the mill. This article walks through a Taiwanese brass bar certificate, a layout US quality teams do not always recognize. My running example is a lead-free C6801 certificate from a Taiwanese bar supplier, delivered in October 2026.

What should you check in the header?

The top of the certificate usually carries the issuer, a delivery or issue date, a purchaser field and a report number. Check whether the issuer melted the metal or is a distributor passing mill data along, which should still trace back to a mill document. A certificate dated well before the bar shipped means either older stock, which is fine if the traceability number matches, or a different lot.

On the certificates that will travel with Celvor Industrial parts, the purchaser field will be blacked out. The bar is bought by the partner shop that turns the parts, under its own account, and I do not publish that shop's name. Everything that describes the metal will be left as the mill issued it: the issuer, the date, the heat or report number, the chemistry and the mechanical block. I would rather say so here than have you find a masked field and wonder what else was touched.

Does the product line match the bar that was actually cut?

Below the header is the product line: grade, shape, size, length and weight. On my C6801 certificate the size reads as hex bar, 0.433 in (11.0 mm) across flats. Match shape and size to your drawing, not just the grade. If your part is turned from hex bar and the certificate describes round bar of another size, the paper belongs to a different bar.

Read the grade field itself. On the same certificate it holds the supplier's own item code, followed by a description: lead-free hex free-cutting brass bar (C6801). Some certificates give only an item code or trade name and leave you to match the chemistry to a grade. If the grade on your drawing does not appear anywhere on the paper, ask which standard the chemistry was checked against.

Why does the heat number matter most?

A heat number, sometimes printed as a lot or charge number, identifies one melt, and every value on the certificate belongs to it. To be useful, it has to appear in three places: on the certificate, on the tag of the bar bundle, and in the record of which bar went into which production lot of parts.

Not every certificate has one. The lead-free certificates I have from one Taiwanese supplier have no separate heat number field, only a report number. Every Celvor lot will be matched to the certificate for the bar it was turned from, by the traceability number on that certificate. If you need more, such as a true heat number rather than a report number, one heat per lot, or heat numbers on each lot's shipping papers, ask at quotation.

How do you read the chemistry table?

The chemistry table usually puts the limits above the results. On one supplier's certificates the upper row is labeled Standard and the lower row Product: the range the mill sells to, and the analysis of this bar. Some use MAX, MIN and RESULT rows instead. If your drawing names ASTM B16, checking the measured values against your limits is your job, not the mill's.

On the C6801 certificate, bismuth reads 0.8067% against a 0.5–4.0% standard, and lead 0.0036% against 0.01% maximum. Another C6801 certificate I have on file, from a different lot of bar, reads bismuth 1.88% and lead 0.0053%. Both sit inside the standard. Lots of one grade can read far apart, as these two do, or almost alike, so the certificate has to match the bar.

A measured value often carries more decimal places than the limit above it: 0.0036% lead is an instrument reading, while 0.01% is a limit written into a standard. Check whether the numbers repeat exactly. Two C3604 certificates I have, issued a few months apart, show identical chemistry, and both carry a note that the chemistry is tested on the billet. Ask whether the figures were taken for your lot.

Zinc is often printed as "Rem." (remainder) in both the limits and the results. Where it is a number, add the row up; well over 100% means something was copied wrong. Also check whether results are single figures or ranges. A results range identical to the standard is the specification restated. A narrower one, like copper 59.0–59.5% against a 57–64% standard on my C6801 certificate, is not the specification, but it is not one analysis either; ask what it covers.

Minor elements are often lumped into one Others column; on the C6801 certificate, iron, tin, nickel and the rest come to 0.88% against 1% maximum. Some certificates also carry cadmium and mercury columns, which buyers with RoHS requirements look for. A column on a bar certificate is data about the bar, not a compliance statement for your part.

Are the mechanical properties test results or the standard?

The mechanical block is where specification values most often stand in for measurements. On my C6801 certificate the whole block is labeled as the test standard and given as ranges, tensile 48–53 kgf/mm² among them. It is the range for the grade. It does not show a tensile test on this bar.

The unit is kgf/mm², not psi or MPa. 1 kgf/mm² is about 1,422 psi (9.81 MPa), so 48–53 kgf/mm² is about 68,300–75,400 psi (471–520 MPa). If your part depends on a mechanical property, ask before the order whether the block is tested or declared.

Is the size tolerance on the certificate your part tolerance?

Bar certificates often carry a size tolerance for the stock. My C6801 certificate gives +0/−0.0020 in (+0/−0.05 mm) on the bar size. That tells you whether hex flats can be left unmachined on the finished part.

It has nothing to do with the tolerances on your drawing. Part dimensions belong on the inspection report, in Celvor's case the first-article report, a different piece of paper. Where your drawing calls for it, turned features are held to ±0.0008 in (±0.02 mm).

What do EN 10204 types 2.1, 2.2, 3.1 and 3.2 mean?

At the bottom, one supplier's certificates carry three name seals, for production control, quality control and the tester, plus a rectangular stamp from the materials lab. All of them belong to the supplier's own departments. Who stamped it matters, because that is half of how EN 10204 sorts certificates.

Many buyers classify inspection documents using EN 10204. Its four types split on two questions: were the results taken from the products actually supplied, and who validated them.

Type 2.1 is the manufacturer's declaration of compliance, with no test results. Type 2.2 adds results from non-specific inspection: tests on product made by the same process, not necessarily what you received. Type 3.1 gives results from specific inspection, on the products supplied or their test units, validated by an inspection representative independent of the manufacturing department. Type 3.2 adds a second validation by the purchaser's representative or an officially designated inspector.

The brass certificates I have on file name no EN 10204 type, and I do not assign one to them. The steel certificates do. Two stainless certificates I have from the same mill, for the same grade and bar size, are marked 3.1 in 2022 and 2.2 in 2024. An analysis stamped by the supplier's own staff is not automatically a 3.1, because the standard asks who validated the results as much as what was measured. If your order requires 3.1, say so at quotation; availability depends on the mill, grade and quantity, so it is confirmed and quoted separately.

What does a mill certificate not prove?

It does not prove the finished part. Machining, plating and handling all happen after the certificate was printed.

It is not a product certification. A certificate showing 0.0053% lead is evidence about one input. NSF/ANSI/CAN 372 and 61 are standards; certification to them is granted by an accredited body to a specific product, and the paper from the mill is not that certification.

It does not cover leaching. Lead content measures what is in the metal; NSF/ANSI/CAN 61 measures what comes out of the product into water.

It does not cover the assembly. The US 0.25% limit is a weighted average across the wetted surfaces of a pipe, fitting or fixture, so one part's certificate is only one input to that number.

How is a mill certificate different from a CoC and a first-article report?

They answer three different questions. A certificate of conformance (CoC) is the supplier's declaration that the shipment meets the drawing and the order. The mill certificate is the bar producer's data on the metal, which the supplier must not alter. The first-article report measures the first part against the drawing.

A shipment where one is relabeled as another leaves that document's question unanswered.

What comes with a Celvor Industrial lot?

Every lot, in every material, will ship with the mill certificate for the bar it was turned from, passed on as the mill issued it except for the purchaser field, which will be masked for the reason given above. Every lot will also ship with a first-article inspection report.

What does not come with it is a product certification. Celvor Industrial does not hold an NSF/ANSI/CAN product certification, and a mill certificate will not be described as one.

This is general information about reading material certificates, not compliance, legal or engineering advice. Certificate formats vary by mill and country; where a regulation or customer quality clause applies, confirm the certificate type you need with a compliance professional before ordering.

Sean Shih is the founder of Celvor Industrial in Taichung, Taiwan.

If you are sourcing turned brass parts, send the drawing.