Capabilities

CNC turned components in brass, aluminum and steel, machined to the tolerances on your drawing.

What we machine and how it is checked.

Typical parts

Turned parts for water, air, gas and general assembly, in production quantities.

Drawings show typical features. Every part is made to your drawing.

Materials

Material Closest US / UNS JIS Notes
Free-cutting brass C36000 C3604 Leaded. The standard grade for most turned brass fittings and valve components. Bar to C36000 (ASTM B16) or C3604 (JIS H3250), as your drawing specifies.
Lead-free brass — C6801 Bismuth-bearing, JIS H3250, for low-lead and lead-free requirements. Lead-free bar is stored and labeled apart from leaded brass. Machines are cleaned out before a lead-free lot, and the chips are collected separately. Mill certificate with every lot.
Aluminum 6061 / 6063 A6061 / A6063 Other alloys as specified on your drawing.
Free-cutting steel 12L14 / 1215 / 1144 — Leaded and non-leaded free-cutting grades for high-volume turned parts. 1144 where the part needs more strength than 12L14 or 1215.
Carbon steel 1008 / 1015 / 1045 S45C Low-carbon 1008 and 1015 for general turned parts; medium-carbon 1045 for shafts and pins.
Alloy steel — SCM415 Chromium-molybdenum steel for case-hardened parts. SCM415L, the leaded free-cutting grade, is used only when your drawing specifies it.
Stainless steel 303 / 304 / 316 SUS303 / SUS304 / SUS316 303 for free-machining work; 304 and 316 where corrosion resistance is required.
Other materials
Quoted per drawing.

Measured lead content

  • C3604 brass Pb 2.65% Mill certificate of a lot machined.
  • C6801 lead-free brass Pb 0.0053% Mill certificate of a lot machined.
  • US drinking-water limit 0.25% Weighted average of wetted surfaces, Safe Drinking Water Act.

Figures are from the mill certificates of lots machined, not a product certification. NSF/ANSI/CAN 372 listing, where a project requires it, is arranged by the buyer.

Inspection and finishing

Measurement
Vision measuring system. Dimensions are checked against the drawing, and the results are reported.
First article
First-article inspection report with every lot. The first piece is measured and reported before the lot runs.
Mill certificate
With every lot.
Finishing
Plating, anodizing, secondary machining and assembly — handled in one order.
Packing
Several part numbers on one order can be shipped together, packed and labeled by part number.
Sample first-article inspection report listing each drawing dimension with its nominal value, tolerance, measured values and a pass or fail result.
Sample first-article inspection report, in the format supplied with every lot. Values are illustrative.